Skip to main content

Case Study

Coca Cola

The outside of a Coca Cola Facility

Coca-Cola fully funds infrastructure upgrades from 30% energy savings delivered by Ecosave

Investing in energy efficiency and equipment upgrades has resulted in reduced operating expenses and new building equipment for the Coca-Cola Corporation.

Ecosave was asked to provide solutions to improve energy efficiency as well as address repairs and replacement of aging and end-of-life equipment in Coca-Cola’s bottling plant.

Ecosave developed an integrated energy savings project that consisted of optimizing existing equipment, replacing inefficient equipment and bundling it with several controls measures that were used to drive deeper savings and a shorter payback period.

Ecosave engineers, with deep experience in food production, uncover more savings, and by implementing ongoing monitoring and reporting, assist your staff in improving efficiencies

Project Details

Building Type
Industrial
Location
N/A
Industry
Industrial
Solutions
Energy Efficiency
Testimonial

"Ecosave identified and implemented a number of cost effective, energy efficient projects at several of our sites. I was very impressed with Ecosave's professionalism and knowledge of all aspects of energy efficiency and how the projects were implemented on time and with minimal disruption to the manufacturing processes."

Sally Armstrong

Coca Cola Corporation

Project Results

$2 M Upgrade Value
$615K Annual Savings
30% Annual Energy Savings

More Success Stories

Browse our other case studies to see how Ecosave's solutions resulted in significant savings for multiple industries.